Steelbuild Infra Projects IPO
Steelbuild Infra Projects IPO - date, issue size, exchange status & DRHP details 2026
Steelbuild Infra Projects filed its draft red herring prospectus (DRHP) with NSE Emerge on 25 Sep 2026 for an IPO of a fresh issue of up to 28,80,000 shares. The draft is under review at NSE Emerge. The price band, lot size and IPO dates are not announced yet.
Steelbuild Infra Projects designs, makes and erects pre-engineered steel buildings at two plants in Sonipat, Haryana, with 50,000 MT a year of installed capacity. Revenue from operations grew from Rs 157.73 crore in FY2024 to Rs 339.80 crore in FY2026.
Where the Steelbuild Infra Projects IPO stands
From draft to listing. Today is 25 November 2026.
- DRHP filed 25 Sep 2026
- Exchange approval TBA
- RHP & price band TBA
- Bidding TBA
- Listing TBA
| DRHP filed with NSE Emerge | 25 Sep 2026 |
|---|---|
| Exchange status | Under exchange review |
| RHP, price band & dates | Not announced |
IPO Guru insights
Worked out by us from the figures in the DRHP and NSE Emerge's past filings. Facts, not a recommendation.
Steelbuild Infra Projects IPO details
The offer as the DRHP describes it. Terms can change in the RHP.
The offer
| Issue method | Book built issue |
|---|---|
| Total issue | Up to 28,80,000 shares |
| Issue type | Fresh issue only |
| Fresh issue | Up to 28,80,000 shares |
| Offer for sale | None |
| Total issue size | Depends on the price band |
| Face value | ₹10 per share |
| Price band | Not announced (comes with the RHP) |
| Lot size | Not announced (retail applications are two lots on SME) |
| IPO dates | Not announced |
Shares & intermediaries
| Shares before the issue | 80,10,000 |
|---|---|
| Shares after the issue | 1,08,90,000 (pre-issue + fresh shares) |
| Proposed listing | NSE Emerge (SME platform) |
| Book running lead managers | Hem Securities Limited |
| Registrar | Maashitla Securities Private Limited |
Share of the offer set aside for each investor category, as stated in the offer document.
Strengths & risks
The case for and against, from the DRHP's own numbers and risk factors.
Strengths · 6
- 01Revenue from operations grew from Rs 157.73 crore in FY2024 to Rs 339.80 crore in FY2026, a CAGR of 46.78% as stated in the draft.
- 02Profit after tax rose from Rs 2.29 crore in FY2024 to Rs 15.22 crore in FY2026, and PAT margin moved from 1.45% to 4.48%.
- 03Installed capacity doubled to 50,000 MT a year after the Katwal unit was added in 2025, on top of the 25,000 MT Halalpur unit.
- 04Return on equity was 92.33% and return on capital employed was 53.13% in FY2026, on a small net worth of Rs 24.09 crore.
- 05The company has an in-house design team of 17 people and testing facilities such as ultrasonic and dye penetrant testing, and is ISO 9001:2015 certified.
- 0646 of its 270 customers in FY2026 gave repeat orders, and no single state outside Haryana gave more than 20.91% of revenue.
Risks · 10
- 01Operating cash flow was negative Rs 4.99 crore in FY2026 even though profit after tax was Rs 15.22 crore, because inventories and receivables absorbed cash.
- 02Trade receivables rose from Rs 11.73 crore in March 2024 to Rs 56.39 crore in March 2026, and inventories reached Rs 52.40 crore.
- 03Top 10 customers gave 43.63% of FY2026 revenue and the top customer alone gave 16.79%, up from 7.31% in FY2025.
- 04Top 5 suppliers made up 55.40% of FY2026 purchases and the top supplier 25.15%, with no long-term supply contracts.
- 05Haryana alone gave 41.47% of FY2026 revenue, and Haryana, Uttar Pradesh and Rajasthan together gave 70.67%.
- 06The restated financials were certified by a peer-reviewed chartered accountant who is not the statutory auditor.
- 07Both promoters hold 50.00% each before the issue, and the company's registered office and manufacturing premises are on lease.
- 08The company has not yet placed orders for machinery worth Rs 846.23 lakh for the new plant, and has applied for Consent to Operate for Manufacturing Unit-I in September 2026.
- 09Rs 22.50 crore of the fresh issue goes to working capital and the general corporate purposes amount is not yet fixed, so only part of the use of funds is specific.
- 10Total borrowings stood at Rs 12.06 crore in March 2026, against Rs 3.32 crore a year earlier, and the fourth quarter gave 39.11% of annual revenue, which makes revenue lumpy.
Steelbuild Infra Projects financials
Restated standalone figures in ₹ crore, as reported in the DRHP.
| ₹ crore | 31 Mar 2026 | 31 Mar 2025 | 31 Mar 2024 |
|---|---|---|---|
| Revenue from Operations | 339.80 | 202.90 | 157.73 |
| Total Income | 339.91 | 203.40 | 157.91 |
| EBITDA | 20.43 | 6.33 | 3.07 |
| Profit After Tax | 15.22 | 4.85 | 2.29 |
| Net Worth | 24.09 | 8.87 | 4.02 |
| Reserves and Surplus | 16.08 | 8.86 | 4.01 |
| Total Borrowing | 12.06 | 3.32 | 1.15 |
| Total Assets | 123.28 | 82.15 | 40.41 |
Key ratios (FY26)
P/E and market capitalisation need the price band and are added when the RHP is out.
Key performance indicators
| KPI | 31 Mar 2026 | 31 Mar 2025 | 31 Mar 2024 |
|---|---|---|---|
| Return on equity (RoE) | 92.33% | 75.21% | 79.32% |
| Return on capital employed (RoCE) | 53.13% | 51.34% | 55.05% |
| Return on net worth (RoNW) | 63.17% | 54.66% | 56.80% |
| EBITDA margin | 6.01% | 3.12% | 1.95% |
| PAT margin | 4.48% | 2.39% | 1.45% |
| EPS (Rs) | 19.00 | 6.06 | 2.85 |
| NAV per share (Rs) | 30.08 | 11.08 | 5.02 |
As stated in the DRHP's KPI section.
Where the IPO money goes
₹58.37 crore of the fresh issue is earmarked to named objects.
About Steelbuild Infra Projects
The company started in 2020 at Halalpur, Sonipat, Haryana, with 25,000 MT a year of capacity. A second unit at Katwal, Sonipat was added in 2025 with another 25,000 MT, taking installed capacity to 50,000 MT a year. It holds ISO 9001:2015 certification and has 17 in-house design and engineering staff as of 31 August 2026.
In FY2026 it served 270 customers, of which 46 gave repeat orders. Haryana, Uttar Pradesh and Rajasthan together gave 70.67% of FY2026 revenue. The company was converted from a private to a public limited company in June 2026 and is led by promoters Varun Arora and Sandeep Kumar Mendiratta.
The industry
The industry report in the draft says India's construction sector gross value added rose from Rs 21.09 lakh crore in FY23 to Rs 26.64 lakh crore in FY26, a CAGR of about 8.01%. It is projected to reach Rs 38.84 lakh crore in FY31, a CAGR of about 7.8% over FY26 to FY31. The report links PEB demand to warehousing, which it expects to grow from USD 38.99 billion in 2025 to USD 59.34 billion by 2030, a CAGR of 8.76%. It describes the Indian PEB market as fragmented.
Customer concentration: Top 10 customers gave 43.63% of FY2026 revenue (42.26% in FY2025).
Promoters & management
Varun Arora and Sandeep Kumar Mendiratta hold 40,04,997 shares each, which is 50.00% each of the pre-issue paid-up capital.
| Name | Role |
|---|---|
| Varun Arora | Chairman and Managing Director |
| Sandeep Kumar Mendiratta | Whole-time Director |
| Mahima Gandhi | Non-Executive Director |
The bankers & the filings
Who is running the issue, and the documents filed with NSE Emerge this page is built from.
Lead Manager Track Record
How the book-running lead managers on this issue have priced their past IPOs, measured on listing day.
Hem Securities Ltd.
21 issues handled (4 mainboard, 17 SME)Best listing: Credent Connect N Care (+90.0%). Weakest: E to E Transportation Infrastructure (0.0%).
Listing gain compares the listing-day opening price with the issue price, using the IPOs on IPO Guru that this lead manager has taken to market. A strong record reflects how the banker has priced past issues - it is not a forecast for this one. See every issue they have handled on the lead managers page.
Steelbuild Infra Projects IPO: frequently asked
When will the Steelbuild Infra Projects IPO open?
The Steelbuild Infra Projects IPO dates are not announced yet. The draft is under review at NSE Emerge. The company announces the dates and price band after it files its red herring prospectus (RHP) with the Registrar of Companies, usually a week or two before bidding opens. This page switches to the full IPO page with dates, price band and lot size as soon as that happens.
What is the Steelbuild Infra Projects IPO price band?
The price band is not announced yet. It is set by the company and its lead managers and published with the RHP, a few days before the issue opens. The DRHP fixes only the face value of ₹10 per share.
How big is the Steelbuild Infra Projects IPO?
Steelbuild Infra Projects filed its draft red herring prospectus (DRHP) with NSE Emerge on 25 Sep 2026 for an IPO of a fresh issue of up to 28,80,000 shares. The final size in rupees depends on the price band.
Has NSE Emerge approved the Steelbuild Infra Projects IPO?
The draft is under review at NSE Emerge. SEBI does not review SME offer documents: NSE Emerge examines the draft, which is open for public comments for 21 days, and gives in-principle approval before the company can launch.
What is the Steelbuild Infra Projects IPO GMP?
There is no grey market premium to report before the price band is announced. IPO Guru starts tracking the Steelbuild Infra Projects IPO GMP once the RHP and price band are out.
What will Steelbuild Infra Projects do with the IPO money?
As per the DRHP: Set up a new PEB manufacturing unit (₹29.87 crore); Fund working capital requirements (₹22.5 crore); Repay or prepay part of borrowings (₹6 crore); General corporate purposes.
Who are the lead managers of the Steelbuild Infra Projects IPO?
The book running lead managers are Hem Securities Limited. Maashitla Securities Private Limited is the registrar.
Where are Steelbuild Infra Projects' plants?
Both plants are in Sonipat, Haryana: Halalpur with 25,000 MT a year and Katwal with 25,000 MT a year, 50,000 MT in all.
Who owns Steelbuild Infra Projects?
Promoters Varun Arora and Sandeep Kumar Mendiratta hold 50.00% each of the pre-issue capital of 80,10,000 shares.
Other companies in the IPO pipeline
SME companies with drafts filed with NSE Emerge or BSE SME, same bankers first.
Know the day the price band is out.
We track every SME draft from exchange filing to listing. When Steelbuild Infra Projects files its RHP, this page becomes the full IPO page with dates, price band, lot size, GMP and subscription.
Not investment advice. Figures are from the company's draft offer document filed with NSE Emerge and may change in the RHP.