IPO Guru
Bajaj
Listed SME

Shayona Engineering IPO Subscription Status

Shayona Engineering IPO was subscribed 5.21 times when bidding closed on 27 Jan 2026: QIB 3.33x, NII 8.08x, Retail 3.73x.

The Shayona Engineering IPO has been subscribed 5.21x times overall. Retail investors have shown interest with bids for 3.73x the shares available. The Non-Institutional Investor (NII) category has been subscribed 8.08x. Within NII, Big HNI (B-HNI) subscribed 12.46x and Small HNI (S-HNI) subscribed 5.01x. Qualified Institutional Buyers (QIBs) have subscribed 3.33x. Data last updated on 25 Aug, 12:55 PM.

The IPO subscription period has ended. The issue opened on 22 Jan, 2026 and closes on 27 Jan, 2026. The shares are expected to list on stock exchanges on 30 Jan, 2026.

Abhishek Vohera, Founder of IPO Guru Researched & reviewed by Abhishek Vohera, Founder, IPO Guru Last updated Figures sourced from the RHP, BSE & NSE

Live bidding

Shares bid against shares offered, category by category, as published by the exchanges. Summary splits NII into bHNI (above ₹10 lakh) and sHNI (₹2–10 lakh); switch to Detailed for the exchange's own sub-category rows.

Last updated 25 Aug 2026, 12:55 PM
Category Bid details Times
QIB 40,000 of 12,000 2 applications 3.33x
NII 28,43,000 of 3,52,000 462 applications 8.08x
bHNI — bid amount above ₹10 Lakh
22,42,000 265 applications 12.46
sHNI — bid amount ₹2–10 Lakh
6,01,000 197 applications 5.01
Retail 24,94,000 of 6,68,000 1,247 applications 3.73x
TOTAL 53,77,000 1,711 applications 5.21x

Shayona Engineering IPO allotment probability

Your odds of an allotment in each category at the current subscription.

Retail (up to ₹2 L)
1 out of 2
~53.6% chance per PAN — 1,247 applicants for 668 allotment slots. Winners get exactly 1 lot (₹1.4 L) by SEBI lottery, however many lots you bid.
Small HNI (₹2–10 L)
1 out of 3
~30.5% chance — 197 applicants for 60 allotment slots. Lottery allots the minimum S-HNI application of 2 lots (₹2.9 L) per winner; bidding bigger doesn't improve odds.
Big HNI (above ₹10 L)
1 out of 3
~34% chance — 265 applicants for 90 allotment slots. Lottery allots the minimum NII application of 2 lots (₹2.9 L) per winner, the same as S-HNI; any shares left over are allotted proportionately.
QIB (institutions)
3.33x
Proportionate allotment — at 3.33x, institutions receive ~30% of their bid. No lottery; not open to individual investors. Moderate institutional demand.

Odds = allotment slots ÷ applications, or the subscription multiple where counts aren't available. Retail and HNI allotment is by lottery; QIB is proportionate. Not investment advice.

Subscription insights

What the current book is saying, read off the category numbers above.

Retail Allotment

Subscription is above 1x. While a lottery is guaranteed, your probability of allotment is approximately 26.8% for a single lot.

Day-wise subscription history

End-of-day subscription across the 4-day bidding window. On phones, tap a day for the category split.

Date Total
27 Jan 2026
Day 4
5.18x ▼
QIB3.33x NII8.01x Retail3.73x
26 Jan 2026
Day 3
2.33x ▼
QIB3.33x NII3.69x Retail1.69x
23 Jan 2026
Day 2
1.36x ▼
QIB3.33x NII1.67x Retail1.18x
22 Jan 2026
Day 1
1.03x ▼
QIB3.33x NII1.43x Retail0.81x

Shayona Engineering SME IPO dates

From the bidding window to listing. Today is 29 October.

Key dates Listed
  1. Open 22 Jan 2026
  2. Close 27 Jan 2026
  3. Allotment 28 Jan 2026
  4. Refund/credit 29 Jan 2026
  5. Listing 30 Jan 2026

What does this subscription data mean?

IPO subscription data tells you how much demand exists for the shares being offered, broken down by investor category. Understanding each category helps you gauge the real sentiment behind the numbers:

  • 01 QIB (Qualified Institutional Buyers) — includes mutual funds, FIIs, insurance companies, and banks. QIBs do deep due diligence before bidding. A QIB subscription above 10x is a strong institutional endorsement. Watch QIB numbers closely on the final day — they often hold back and flood in after 3 PM.
  • 02 NII / HNI (Non-Institutional Investors) — high-net-worth individuals bidding above ₹2 lakh. NII allotment is proportionate (not lottery), so higher NII subscription means smaller per-lot allotment. Big HNI (B-HNI) bids above ₹10 lakh; Small HNI (S-HNI) bids ₹2–10 lakh.
  • 03 Retail — individual investors bidding up to ₹2 lakh. When retail is below 1x, everyone who applied gets full allotment. When oversubscribed, SEBI mandates a computerised lottery — only 1 lot per successful applicant regardless of how many lots you apply for.
  • 04 Overall Subscription — a blended multiple across all categories. A total subscription above 10x is considered strong; above 50x is exceptional and usually predicts strong listing gains.

Data sourced from BSE/NSE. Subscription numbers are updated during bidding hours (10 AM – 5 PM IST) on active subscription days.

Frequently asked

What is the current subscription status of Shayona Engineering IPO?

As of IPO close date (27 Jan, 2026), the Shayona Engineering IPO is subscribed 5.21x times. Retail category is 3.73x, and NII is 8.08x subscribed.

When is the allotment date for Shayona Engineering IPO?

The allotment for Shayona Engineering IPO is expected to be finalized on 28 January, 2026.

What is the GMP of Shayona Engineering?

The Grey Market Premium (GMP) for Shayona Engineering is currently ₹4, indicating a potential listing gain of 3%.

When will Shayona Engineering IPO list on the stock market?

Shayona Engineering is scheduled to list on BSE and NSE on 30 January, 2026.

What are the chances of getting allotment in Shayona Engineering IPO?

The retail category is oversubscribed at 3.73x, meaning allotment is by lottery. Statistically, approximately 1 in 4 applicants will receive allotment. Applying with multiple family member accounts (each at minimum lot size) improves your cumulative odds.

What does QIB subscription of 3.33x mean for Shayona Engineering IPO?

Moderate — QIBs have subscribed 3.33x. Institutional demand is present but not overwhelming. Watch for any last-minute QIB surge on the final day.

How to check Shayona Engineering IPO allotment status?

After the allotment date (28 Jan, 2026), you can check your Shayona Engineering IPO allotment status on IPO Guru's allotment checker, on the BSE/NSE website using your PAN or application number, or through your broker's app.

Explore Shayona Engineering SME IPO further

Track every stage of this IPO, from subscription to listing.

IPO Guru App
IPO Guru on Android

Subscription moves by the hour. Get it on your phone.

Live GMP alerts, subscription updates and allotment status for every Mainboard and SME issue — fast, free and secure.

Get it on Google Play Join the WhatsApp channel

Not investment advice. Subscription figures are as published by BSE/NSE and change until bidding closes.

Total
5.21x
QIB
3.33x
NII
8.08x
Retail
3.73x
Full IPO details