Kheria Autocomp SME IPO
Kheria Autocomp IPO — date, price band, lot size & details 2026
Kheria Autocomp listed on 24 Sep 2026 at ₹104.9, 3.9% above the ₹101 issue price.
Kheria Autocomp Ltd is a Tier-II auto ancillary making plastic injection moulded components and sub-assemblies for passenger vehicles, covering interior trims, exterior parts, under-hood components and HVAC ducts for both petrol and electric models. Its plant sits inside the Tata Vendor Park at Sanand, Gujarat with 30 moulding machines.
Stock price
Kheria Autocomp is listed — here is the live share price.
Timetable
Key dates from opening to listing. Today is 13 October.
- Open 17 Sep 2026
- Close 21 Sep 2026
- Allotment 22 Sep 2026
- Refund/credit 23 Sep 2026
- Listing 24 Sep 2026
Issue summary
The terms of the offer, as filed.
| IPO Dates | 17 to 21 Sep, 2026 |
|---|---|
| Price Band | ₹96 – ₹101 |
| Face Value | ₹10 |
| Lot Size | 1200 Shares |
| Issue Size | ₹46.44 Cr |
| Sale Type | Fresh capital only |
| Listing On | NSE SME |
| Registrar | KFin Technologies Limited |
| Min Investment | ₹ 2,42,400 |
Share of the offer set aside for each investor category, as stated in the offer document.
What will it cost me?
Bidding is in multiples of 1200 shares at the ₹101 cut-off. The SME retail application is a fixed 2 lots; HNI starts at 3.
| Application | Lots | Shares | Amount |
|---|---|---|---|
| Retail (min) | 2 | 2,400 | ₹2,42,400 |
| Retail (max) | 2 | 2,400 | ₹2,42,400 |
| HNI (min) | 3 | 3,600 | ₹3,63,600 |
Strengths & risks
Drawn from the offer document — the case for and against, side by side.
Strengths · 8
- 01Profit has more than tripled in two years, from Rs 3.31 crore in FY2024 to Rs 8.24 crore in FY2025 and Rs 11.42 crore in FY2026.
- 02Sales have almost doubled over the same period, from Rs 62.40 crore to Rs 120.30 crore.
- 03EBITDA has more than doubled, from Rs 9.76 crore in FY2024 to Rs 22.90 crore in FY2026.
- 04Return ratios are strong, with RoNW of 33.72% and RoCE of 26.89%, and a PAT margin of 9.52%.
- 05The issue is priced moderately at about 14.01 times earnings on an EPS of Rs 7.21.
- 06Being located inside the Tata Vendor Park at Sanand puts it right next to its customer base, which cuts logistics cost and helps with just-in-time supply.
- 07It supplies parts for both petrol and electric vehicles, so the shift to EVs does not make its products redundant.
- 08The plant is well equipped with 30 injection moulding machines from 120 to 1,700 tons, and a 636 kW solar system reduces the power bill.
Risks · 9
- 01Being a Tier-II supplier means it sells to Tier-I vendors rather than to the vehicle makers, so it sits one step further from the customer and has less say on price.
- 02Having its plant inside the Tata Vendor Park is convenient but also means heavy dependence on one manufacturer ecosystem. Any change in that relationship would be serious.
- 03Almost the entire issue goes into one project. Rs 39.96 crore of the Rs 46.44 crore raised goes into a new facility at GIDC Sanand, which brings execution risk and a gap before it earns.
- 04Borrowing was Rs 35.03 crore against a net worth of Rs 39.52 crore, a debt to equity ratio of 0.89, and it has nearly doubled in two years.
- 05Demand follows the passenger vehicle cycle. A slowdown in car sales passes straight through to a component supplier.
- 06The raw material is polymer, which is linked to crude oil prices.
- 07The company is small, with about 113 employees and a single facility of roughly 3 acres.
- 08Promoter holding will come down from 100% to 70.99% after the issue.
- 09This is an SME issue. One lot is 1,200 shares, which is about Rs 1.21 lakh at the upper band of Rs 101, and SME shares usually trade in low volume after listing.
Three years of numbers
All figures in ₹ crore, as reported in the Kheria Autocomp offer document.
| Metric | 31 Mar 2026 | 31 Mar 2025 | 31 Mar 2024 |
|---|---|---|---|
| Assets | 106.23 | 81.79 | 53.14 |
| Total Income | 120.30 | 92.31 | 62.40 |
| Profit After Tax | 11.42 | 8.24 | 3.31 |
| EBITDA | 22.90 | 16.18 | 9.76 |
| NET Worth | 39.52 | 28.24 | 20.00 |
| Reserves and Surplus | 28.27 | 23.74 | 15.50 |
| Total Borrowing | 35.03 | 30.90 | 18.83 |
See how this IPO compares — view listing performance of all SME IPOs.
Valuation & key ratios
Ratios are for the latest full financial year reported in the Kheria Autocomp RHP. EPS and P/E are post-issue — the table below carries the pre-issue comparison.
Kheria Autocomp IPO Valuation
How the issue prices the company before and after the fresh shares are created.
| Valuation Metric | Pre-Issue | Post-Issue |
|---|---|---|
| EPS (₹) | ₹10.15 | ₹7.21 |
| P/E Ratio (x) | 9.95 | 14.01 |
| Market Cap at Offer Price (₹ Cr) | ₹114.00 | ₹160.07 |
Pre-issue figures use the shareholding reported in the RHP; post-issue figures use the shareholding once the fresh issue has created new shares. The two differ because of that dilution and because post-issue earnings per share are often annualised, so the change can run in either direction. Market capitalisation is calculated at the ₹101 offer price. Compare the post-issue P/E against listed peers before deciding — a premium there is growth you are paying for in advance.
Where the money goes
₹39.96 Cr of the issue is earmarked to named objects.
About the company
It works as a Tier-II supplier. That means it does not sell to the car makers directly but supplies moulded components to Tier-I vendors, who then supply the original equipment manufacturers. Its parts go into passenger vehicles.
Its product range covers interior cabin trims, exterior plastic parts, under-hood components and heating, ventilation and air conditioning ducts, and it supplies these for both internal combustion engine vehicles and electric vehicles, so it is not tied to one type of powertrain. Its manufacturing facility is inside the Tata Vendor Park at Sanand in Gujarat, covering about 3 acres, with 30 injection moulding machines ranging from 120 tons to 1,700 tons of clamping force. The company has also put up a 636 kW solar power system and four groundwater recharge wells at the site. As on 31 March 2026 it had about 113 employees.
Interested in this IPO? Check the live subscription status or browse all upcoming SME IPOs.
+91 98310 32670
The bankers & the filings
Who is running the book, and the documents this page is built from.
Company contact
Frequently asked
What is the GMP of Kheria Autocomp?
The current Grey Market Premium is ₹3, or 2.97% over the issue price.
What is the Kheria Autocomp IPO price band?
₹96 to ₹101, on a face value of ₹10.
When is the allotment?
The basis of allotment is 22 September 2026, with listing on 24 September 2026.
How do I check allotment status?
On the IPO Guru allotment page or on the registrar's site — KFin Technologies Limited.
Every number here traces back to a filing.
IPO Guru tracks GMP, subscription and allotment for every SME and Mainboard issue. Every number on this page is sourced from the RHP, BSE & NSE.
Not investment advice. Grey market premium is an unofficial, unregulated indicator and is not a forecast.