IPO Guru
Bajaj
Closed Mainboard

Sadbhav Engineering IPO

Sadbhav Engineering IPO — date, price band, lot size & details 2006

Sadbhav Engineering listed on 1 Mar 2006 at ₹220, 18.9% above the ₹185 issue price.

Sadbhav Engineering is an Ahmedabad based construction company that builds roads and highways, irrigation works and carries out mining operations. Its total income was Rs 207.28 crore in FY2005.

Stock price

Sadbhav Engineering is listed — here is the live share price.

Loading market data…
Abhishek Vohera, Founder of IPO Guru Researched & reviewed by Abhishek Vohera, Founder, IPO Guru Last updated Figures sourced from the RHP, BSE & NSE

Timetable

Key dates from opening to listing. Today is 12 November.

Key dates Listed
  1. Open 03 Feb 2006
  2. Close 08 Feb 2006
  3. Allotment 21 Feb 2006
  4. Refund/credit TBA
  5. Listing 01 Mar 2006

Issue summary

The terms of the offer, as filed.

IPO Dates 3 to 8 Feb, 2006
Price Band ₹165 – ₹185
Face Value ₹10
Lot Size 35 Shares
Issue Size ₹53.65 Cr
Sale Type Fresh capital only
Listing On BSE, NSE
Registrar MUFG Intime India Private Limited
Min Investment ₹ 6,475
Reservation
QIB 50%
NII 15%
Retail 35%
Employee 3.45%

Share of the offer set aside for each investor category, as stated in the offer document.

What will it cost me?

Bidding is in multiples of 35 shares at the ₹185 cut-off. Drag to size your application.

shares
1 lot lots
Application Lots Shares Amount
Retail (min) 1 35 ₹6,475
Retail (max) 30 1,050 ₹1,94,250
S-HNI (min) 31 1,085 ₹2,00,725
S-HNI (max) 154 5,390 ₹9,97,150
B-HNI (min) 155 5,425 ₹10,03,625

Strengths & risks

Drawn from the offer document — the case for and against, side by side.

Strengths · 4

  • 01Profit after tax rose from Rs 4.27 crore in FY2003 to Rs 7.39 crore in FY2005.
  • 02Net worth rose from Rs 36.51 crore in FY2003 to Rs 65.89 crore in September 2005.
  • 03It works in 3 areas: roads, irrigation and mining.
  • 04Total income was Rs 123.82 crore in six months to September 2005.

Risks · 5

  • 01Total income fell from Rs 247.31 crore in FY2004 to Rs 207.28 crore in FY2005.
  • 02EBITDA fell from Rs 30.93 crore in FY2003 to Rs 27.25 crore in FY2005.
  • 03It had to go to court to recover money from some clients; total assets were Rs 229.85 crore.
  • 04Government contracts depend on budgets and payments; profit was Rs 5.70 crore in six months.
  • 05Promoter group holding fell from 74.29% before the issue to 54.53% after it.

Three years of numbers

All figures in ₹ crore, as reported in the Sadbhav Engineering offer document.

Total income
123.82
247
207
124
31 Mar 200431 Mar 200530 Sep 2005
Profit after tax
5.70
5
7
6
31 Mar 200431 Mar 200530 Sep 2005
EBITDA
15.96
28
27
16
31 Mar 200431 Mar 200530 Sep 2005
Net worth
65.89
41
60
66
31 Mar 200431 Mar 200530 Sep 2005
Metric 30 Sep 2005 31 Mar 2005 31 Mar 2004 31 Mar 2003
Assets 229.85 213.38 191.70 190.34
Total Income 123.82 207.28 247.31 214.56
Profit After Tax 5.70 7.39 5.05 4.27
EBITDA 15.96 27.25 27.71 30.93
NET Worth 65.89 60.30 41.42 36.51
Reserves and Surplus 58.04 52.35 40.42 35.51

See how this IPO compares — view listing performance of all mainboard IPOs.

Valuation & key ratios

Ratios are for the latest full financial year reported in the Sadbhav Engineering RHP. EPS and P/E are post-issue — the table below carries the pre-issue comparison.

P/E Ratio
17.7
EPS (₹)
10.45
RoNW
12.24%
NAV (₹)
75.37

Sadbhav Engineering IPO Valuation

How the issue prices the company before and after the fresh shares are created.

Valuation Metric Pre-Issue Post-Issue
EPS (₹) ₹9.24 ₹10.45
P/E Ratio (x) 20.03 17.70
Market Cap at Offer Price (₹ Cr) ₹114.12 ₹100.91

Pre-issue figures use the shareholding reported in the RHP; post-issue figures use the shareholding once the fresh issue has created new shares. The two differ because of that dilution and because post-issue earnings per share are often annualised, so the change can run in either direction. Market capitalisation is calculated at the ₹185 offer price. Compare the post-issue P/E against listed peers before deciding — a premium there is growth you are paying for in advance.

Where the money goes

₹59.63 Cr of the issue is earmarked to named objects.

Investment in Mumbai Nasik Expressway Limited ₹35.00 Cr
Margin Money for Purchase of Capital Equipment ₹4.00 Cr
Margin Money for working capital requirement ₹16.46 Cr
Issue related Expenses ₹4.17 Cr

About the company

Sadbhav Engineering Limited was incorporated in 1988, with its registered office at Sadbhav House, Ahmedabad. Its promoters are Vishnubhai M. Patel and Shantaben Vishnubhai Patel.

It builds and upgrades roads and highways, builds irrigation works such as earthen dams and canals, and runs mining operations.

It had executed government contracts since incorporation, and had filed cases against some clients to recover money spent on projects.

The IPO was Rs 53.65 crore and was entirely a fresh issue at Rs 185, the top of the Rs 165 to Rs 185 band.

Interested in this IPO? Check the live subscription status or browse all upcoming mainboard IPOs.

Promoters
Vishnubhai M Patel and Shantaben Vishnubhai Patel
Promoter holding
74.29% → 54.53%
Pre-issue → post-issue

The bankers & the filings

Who is running the book, and the documents this page is built from.

Book-running lead manager
Edelweiss Financial Services Ltd View track record →
Book-running lead manager
Inga Ventures Pvt. Ltd View track record →
Book-running lead manager
Karvy Investor Services Ltd View track record →
Red Herring Prospectus
SEBI filing
Final offer document — price band, financials and risk factors. This page is built from it.
Open the RHP

Sadbhav Engineering IPO Documents

Read the filings this page is built from.

Lead Manager Track Record

How the book-running lead managers on this issue have priced their past IPOs, measured on listing day.

Listed in Profit 68.5% 50 of 73 listed
Avg Listing Gain +19.9% across 73 issues
Listed Below Issue 23 of 73 listed

Best listing: Route Mobile (+104.9%). Weakest: ICICI Securities (-16.3%).

Inga Ventures Pvt. Ltd

5 issues handled
Listed in Profit 80% 4 of 5 listed
Avg Listing Gain +13.3% across 5 issues
Listed Below Issue 1 of 5 listed

Best listing: Transrail Lighting (+36.6%). Weakest: Allcargo Global Logistics (-1.5%).

Karvy Investor Services Ltd

31 issues handled
Listed in Profit 87.1% 27 of 31 listed
Avg Listing Gain +24.9% across 31 issues
Listed Below Issue 4 of 31 listed

Best listing: Ramkrishna Forgings (+92.3%). Weakest: Astral Poly Technik (-10.4%).

Listing gain compares the listing-day opening price with the issue price, using the IPOs on IPO Guru that this lead manager has taken to market. A strong record reflects how the banker has priced past issues — it is not a forecast for this one. See every issue they have handled on the lead managers page.

Company contact

Company
Sadbhav Engineering
Email

Frequently asked

What is the GMP of Sadbhav Engineering?

The current Grey Market Premium is ₹0.

What is the Sadbhav Engineering IPO price band?

₹165 to ₹185, on a face value of ₹10.

When is the allotment?

The basis of allotment is 21 February 2006, with listing on 1 March 2006.

How do I check allotment status?

On the IPO Guru allotment page or on the registrar's site — MUFG Intime India Private Limited.

Sadbhav Engineering IPO

Every number here traces back to a filing.

IPO Guru tracks GMP, subscription and allotment for every Mainboard and SME issue. Every number on this page is sourced from the RHP, BSE & NSE.

Join the WhatsApp channel All mainboard IPOs

Not investment advice. Grey market premium is an unofficial, unregulated indicator and is not a forecast.

GMP
₹0
Subscribed
30.83×
Min bid
₹6,475
Size my application
Advertisement