VKS Projects IPO
VKS Projects IPO — date, price band, lot size & details 2012
VKS Projects listed on 18 Jul 2012 at ₹56.35, 2.5% above the ₹55 issue price.
VKS Projects is a Navi Mumbai based EPC contractor for piping, civil, structural, fire fighting and plant commissioning work in chemicals, oil and gas and other industries. Its total income was Rs 60.25 crore in FY2011.
Timetable
Key dates from opening to listing. Today is 23 November.
- Open 29 Jun 2012
- Close 04 Jul 2012
- Allotment 12 Jul 2012
- Refund/credit TBA
- Listing 18 Jul 2012
Issue summary
The terms of the offer, as filed.
| IPO Dates | 29 Jun to 4 Jul, 2012 |
|---|---|
| Price Band | ₹55 – ₹60 |
| Face Value | ₹10 |
| Lot Size | 100 Shares |
| Issue Size | ₹55 Cr |
| Sale Type | Fresh capital only |
| Listing On | BSE, NSE |
| Registrar | Bigshare Services Private Limited |
| Min Investment | ₹ 5,500 |
Share of the offer set aside for each investor category, as stated in the offer document.
What will it cost me?
Bidding is in multiples of 100 shares at the ₹55 cut-off. Drag to size your application.
| Application | Lots | Shares | Amount |
|---|---|---|---|
| Retail (min) | 1 | 100 | ₹5,500 |
| Retail (max) | 36 | 3,600 | ₹1,98,000 |
| S-HNI (min) | 37 | 3,700 | ₹2,03,500 |
| S-HNI (max) | 181 | 18,100 | ₹9,95,500 |
| B-HNI (min) | 182 | 18,200 | ₹10,01,000 |
Strengths & risks
Drawn from the offer document — the case for and against, side by side.
Strengths · 4
- 01Total income rose from Rs 10.79 crore in FY2009 to Rs 60.25 crore in FY2011, and was Rs 97.55 crore in nine months to December 2011.
- 02Profit after tax rose from Rs 0.19 crore in FY2009 to Rs 3.16 crore in FY2011.
- 03Rs 22.64 crore of the issue was for construction equipment and machinery.
- 04Net worth rose from Rs 0.65 crore in FY2009 to Rs 18.44 crore on 31 December 2011.
Risks · 5
- 01Its record is very short, with income of only Rs 10.79 crore in FY2009.
- 02Total borrowing was Rs 20.75 crore on 31 December 2011, above its net worth of Rs 18.44 crore.
- 03The Rs 55 crore issue was nearly three times its net worth, so execution of the plans matters a lot.
- 04The issue was priced at Rs 55, the bottom of its price band.
- 05Promoter holding fell from 99.99% before the issue to 44.44% after it.
Three years of numbers
All figures in ₹ crore, as reported in the VKS Projects offer document.
| Metric | 31 Dec 2011 | 31 Mar 2011 | 31 Mar 2010 | 31 Mar 2009 |
|---|---|---|---|---|
| Assets | 80.09 | 32.41 | 27.97 | 5.10 |
| Total Income | 97.55 | 60.25 | 30.24 | 10.79 |
| Profit After Tax | 5.63 | 3.16 | 2.00 | 0.19 |
| EBITDA | 8.02 | 7.37 | 3.83 | 0.63 |
| NET Worth | 18.44 | 12.81 | 3.15 | 0.65 |
| Reserves and Surplus | 10.44 | 4.81 | 2.60 | 0.60 |
| Total Borrowing | 20.75 | 13.16 | 5.16 | 1.15 |
See how this IPO compares — view listing performance of all mainboard IPOs.
Valuation & key ratios
Ratios are for the latest full financial year reported in the VKS Projects RHP.
Where the money goes
₹55.00 Cr of the issue is earmarked to named objects.
About the company
It takes on EPC contracts for carbon steel, stainless steel and alloy steel turnkey piping, civil land development, industrial and commercial infrastructure, structural fabrication and erection, and fire fighting projects.
It also commissions chemical plants for industries including chemicals and onshore and offshore oil and gas.
The IPO was Rs 55 crore and was entirely fresh issue at Rs 55, the bottom of the Rs 55 to Rs 60 band. The money was for construction equipment, working capital, and design studios and training centres in five cities.
Interested in this IPO? Check the live subscription status or browse all upcoming mainboard IPOs.
The bankers & the filings
Who is running the book, and the documents this page is built from.
VKS Projects IPO Documents
Read the filings this page is built from.
Lead Manager Track Record
How the book-running lead managers on this issue have priced their past IPOs, measured on listing day.
Aryaman Financial Services Limited
12 issues handled (10 mainboard, 2 SME)Best listing: Apollo Micro Systems (+69.1%). Weakest: Karda Constructions (-24.4%).
Listing gain compares the listing-day opening price with the issue price, using the IPOs on IPO Guru that this lead manager has taken to market. A strong record reflects how the banker has priced past issues — it is not a forecast for this one. See every issue they have handled on the lead managers page.
Company contact
Frequently asked
What is the GMP of VKS Projects?
The current Grey Market Premium is ₹0.
What is the VKS Projects IPO price band?
₹55 to ₹60, on a face value of ₹10.
When is the allotment?
The basis of allotment is 12 July 2012, with listing on 18 July 2012.
How do I check allotment status?
On the IPO Guru allotment page or on the registrar's site — Bigshare Services Private Limited.
Every number here traces back to a filing.
IPO Guru tracks GMP, subscription and allotment for every Mainboard and SME issue. Every number on this page is sourced from the RHP, BSE & NSE.
Not investment advice. Grey market premium is an unofficial, unregulated indicator and is not a forecast.