IPO Guru
Bajaj
Listed

GK Energy IPO GMP History

GK Energy IPO has been listed on September 26, 2025 at a listing price of ₹171, against the issue price of ₹153 — a gain of ₹18 (+11.76%). The GMP peaked at ₹34 on 17 September 2025 and reached a low of ₹18 on 22 September 2025. The day-wise GMP trend below shows how grey market sentiment evolved from subscription to listing.

GK Energy IPO raised ₹464.26 Cr. through its IPO at a price band of ₹145 to ₹153 per share, with a lot size of 98 shares. The IPO was open for subscription from 19 Sep 2025 to 23 Sep 2025.

Abhishek Vohera, Founder of IPO Guru Researched & reviewed by Abhishek Vohera, Founder, IPO Guru Last updated Figures sourced from the RHP, BSE & NSE

GMP trend

Grey market premium sampled three times a day (11 AM, 5 PM, 10 PM). Last updated 10 Nov, 5:58 AM IST.

Peak GMP
₹34
17 Sep 2025
Lowest GMP
₹18
22 Sep 2025
Direction
▼ falling
Latest day vs the day before

Day-wise GMP

The last reading of each day, newest first. Arrows compare with the previous day.

Date GMP ↑↓ % Kostak Sub. Sauda
25 Sep 2025 ₹ 19 ▼ 12% — —
23 Sep 2025 ₹ 27 ▲ 18% — —
22 Sep 2025 ₹ 18 ▼ 12% — —
21 Sep 2025 ₹ 20 ▼ 13% — —
20 Sep 2025 ₹ 25 ▲ 16% — —
19 Sep 2025 ₹ 21 ▼ 14% — —
17 Sep 2025 ₹ 34 — 22% — —

GK Energy IPO dates

Key dates from opening to listing. Today is 10 November.

Key dates Listed
  1. Open 19 Sep 2025
  2. Close 23 Sep 2025
  3. Allotment 24 Sep 2025
  4. Refund/credit 25 Sep 2025
  5. Listing 26 Sep 2025

GK Energy IPO actual listing price

How the grey market's final call compared with the listing-day open.

Issue price₹153
GMP-based estimate (pre-listing)₹172 (+12.4%)
Listing gain / loss +₹18 per share
Listing date26 Sep, 2025
Actual listing price ₹171 (+11.76%)

Is GK Energy IPO GMP reliable?

Grey market premium for GK Energy IPO should be interpreted with caution. The GMP is an unregulated, unofficial market not governed by SEBI. Here's how to read the current signal:

  • 01Subscription rate matters: A high GMP paired with strong subscription — especially QIB (Qualified Institutional Buyer) oversubscription — is a more reliable bullish signal than GMP alone. Read our in-depth analysis: GMP vs Subscription Data — Which Predicts Listing Gains Better?
  • 02Timing matters: GMP in the first 1–2 days of subscription is less reliable. GMP on the final subscription day and the day before listing tends to be the most accurate predictor.
  • 03Grey market is thin: For smaller IPOs, even a handful of large orders can swing the GMP significantly. Treat low-volume GMP signals with extra caution.
  • 04Cross-check before acting: Review the GK Energy IPO full review for a fundamentals-based assessment before making any grey market trades.

GK Energy IPO Kostak rate explained

Two ways the grey market trades an IPO application before listing.

Kostak
Not available

The Kostak rate for GK Energy IPO was not available during the subscription period. Kostak is the fixed amount a grey market buyer pays for an IPO application regardless of allotment outcome.

Subject to Sauda
Not available

The Subject to Sauda price was not available for this IPO. Subject to Sauda only applies if allotment is confirmed — the buyer pays a premium on top of the issue price per lot allotted.

Grey market trading is unofficial and unregulated by SEBI. Proceed with full awareness of the associated risks.

About GK Energy IPO

GK Energy Limited was incorporated in 2008. It provides engineering, procurement and commissioning services for solar-powered agricultural water pump systems under Component B of the PM-KUSUM Scheme.

The company offers farmers a single-source solution covering survey, design, supply, assembly, installation, testing, commissioning and maintenance.

It runs an asset-light model and sources solar panels, pumps and other components from suppliers.

The IPO was Rs 464.26 crore, with Rs 400.00 crore of fresh issue and Rs 64.26 crore of offer for sale. Rs 322.46 crore was planned for long-term working capital.

View full IPO details →

Frequently asked

What is the GMP of GK Energy IPO?

The current Grey Market Premium (GMP) of GK Energy IPO is ₹ 19.

What is the Kostak Price of GK Energy IPO?

Kostak rate is the profit made by selling an IPO application before allotment. The current Kostak rate for GK Energy IPO is not available.

What is the Subject to Sauda Price of GK Energy IPO?

Subject to Sauda is the premium amount decided if the allotment is confirmed. The current Subject to Sauda rate is not available.

What was the actual listing price of GK Energy IPO?

GK Energy IPO listed on September 26, 2025 at ₹171, against the issue price of ₹153 — a gain of +11.76%.

How did the GMP of GK Energy IPO trend before listing?

The GMP of GK Energy IPO was falling in its final days before listing. The GMP peaked at ₹34 on 17 September 2025. View the day-wise table above for the complete GMP history.

Explore GK Energy IPO further

The grey market is one signal. Read it alongside the demand, the reviews and the filings before you decide.

GK Energy IPO GMP

The grey market called it. Now check the fundamentals.

IPO Guru tracks GMP, subscription and allotment for every Mainboard and SME issue. Read the grey market alongside the subscription book and the offer document before you apply.

Join the WhatsApp channel All live IPO GMP

Not investment advice. Grey market premium is an unofficial, unregulated indicator and is not a forecast.

GMP
₹ 19
Kostak
—
Listed at
₹171
Full IPO details
Advertisement