Jindal Supreme (India) IPO
Jindal Supreme (India) IPO — date, price band, lot size & details 2026
Jindal Supreme (India) listed on 23 Sep 2026 at ₹120, 29% above the ₹93 issue price.
Jindal Supreme (India) Limited has been making steel pipes and tubes since 1974, supplying MS black and galvanized pipes, metal beam crash barriers and GI tubular poles for infrastructure and industrial use. It manufactures from a single facility at Hisar in Haryana and sells directly to institutional buyers as well as through dealers.
Stock price
Jindal Supreme (India) is listed — here is the live share price.
Timetable
Key dates from opening to listing. Today is 10 October.
- Open 16 Sep 2026
- Close 18 Sep 2026
- Allotment 21 Sep 2026
- Refund/credit 22 Sep 2026
- Listing 23 Sep 2026
Latest news
Our news coverage of Jindal Supreme (India), newest first.
Issue summary
The terms of the offer, as filed.
| IPO Dates | 16 to 18 Sep, 2026 |
|---|---|
| Price Band | ₹88 – ₹93 |
| Face Value | ₹10 |
| Lot Size | 161 Shares |
| Issue Size | ₹124.88 Cr |
| Sale Type | Fresh capital cum OFS |
| Listing On | BSE, NSE |
| Registrar | Bigshare Services Private Limited |
| Min Investment | ₹ 14,973 |
Share of the offer set aside for each investor category, as stated in the offer document.
What will it cost me?
Bidding is in multiples of 161 shares at the ₹93 cut-off. Drag to size your application.
| Application | Lots | Shares | Amount |
|---|---|---|---|
| Retail (min) | 1 | 161 | ₹14,973 |
| Retail (max) | 13 | 2,093 | ₹1,94,649 |
| S-HNI (min) | 14 | 2,254 | ₹2,09,622 |
| S-HNI (max) | 66 | 10,626 | ₹9,88,218 |
| B-HNI (min) | 67 | 10,787 | ₹10,03,191 |
Strengths & risks
Drawn from the offer document — the case for and against, side by side.
Strengths · 8
- 01The company has a very long record, having been in this business since March 1974, which is more than 50 years.
- 02EBITDA improved sharply in FY2026, from Rs 25.92 crore to Rs 41.63 crore.
- 03It has added new products in each of the last two years, crash barriers in FY2025 and GI tubular poles in FY2026, both tied to highway and electrification spending.
- 04Net worth has almost doubled in two years, from Rs 50.31 crore in FY2024 to Rs 96.82 crore in FY2026.
- 05The issue is priced moderately at about 14.33 times earnings on an EPS of Rs 6.49.
- 06Its products go into many end uses, from water supply and highways to oil and gas and rural electrification, so demand is not tied to one sector.
- 07Rs 71 crore of the Rs 124.88 crore issue repays borrowings, which should reduce interest cost meaningfully.
- 08It sells both directly to institutional buyers and through a dealer network, which spreads the customer base.
Risks · 8
- 01Profit actually fell in FY2026, from Rs 24.27 crore to Rs 22.53 crore, even though income rose from Rs 604.74 crore to Rs 675.94 crore.
- 02Return ratios are weak. RoCE was only 6.14% and RoNW was 8.20%, which is low for a manufacturing business.
- 03Debt is high. Total borrowing was Rs 119.87 crore as on 31 March 2026 against a net worth of Rs 96.82 crore, and it went up from Rs 95.84 crore the year before.
- 04The profit margin is thin at 4.33%, so small changes in steel prices move the profit sharply.
- 05Sales are not growing steadily. Total income was Rs 650.88 crore in FY2024, fell to Rs 604.74 crore in FY2025 and then rose to Rs 675.94 crore in FY2026.
- 06The entire business runs from one facility at Hisar in Haryana, so any problem at that single location affects everything.
- 07The latest column in the offer document is only a three month period ending 30 June 2026, so it cannot be compared with the full years before it.
- 08This is a fresh issue combined with an offer for sale, and promoter holding falls from 100% to 73.68% after the issue.
Three years of numbers
All figures in ₹ crore, as reported in the Jindal Supreme (India) offer document.
| Metric | 30 Jun 2026 | 31 Mar 2026 | 31 Mar 2025 | 31 Mar 2024 |
|---|---|---|---|---|
| Assets | 232.65 | 248.41 | 200.33 | 181.16 |
| Total Income | 191.09 | 675.94 | 604.74 | 650.88 |
| Profit After Tax | 8.28 | 22.53 | 24.27 | 12.87 |
| EBITDA | 13.76 | 41.63 | 25.92 | 21.11 |
| NET Worth | 105.02 | 96.82 | 74.64 | 50.31 |
| Reserves and Surplus | 64.56 | 56.28 | 72.17 | 47.90 |
| Total Borrowing | 92.46 | 119.87 | 95.84 | 104.92 |
See how this IPO compares — view listing performance of all mainboard IPOs.
Valuation & key ratios
Ratios are for the latest full financial year reported in the Jindal Supreme (India) RHP. EPS and P/E are post-issue — the table below carries the pre-issue comparison.
Jindal Supreme (India) IPO Valuation
How the issue prices the company before and after the fresh shares are created.
| Valuation Metric | Pre-Issue | Post-Issue |
|---|---|---|
| EPS (₹) | ₹5.59 | ₹6.49 |
| P/E Ratio (x) | 16.64 | 14.33 |
| Market Cap at Offer Price (₹ Cr) | ₹375.00 | ₹474.52 |
Pre-issue figures use the shareholding reported in the RHP; post-issue figures use the shareholding once the fresh issue has created new shares. The two differ because of that dilution and because post-issue earnings per share are often annualised, so the change can run in either direction. Market capitalisation is calculated at the ₹93 offer price. Compare the post-issue P/E against listed peers before deciding — a premium there is growth you are paying for in advance.
Where the money goes
₹71.00 Cr of the issue is earmarked to named objects.
Jindal Supreme (India) IPO Anchor Investors
5 anchor investors across 3 fund houses committed ₹37.46 Cr a day before the issue opened.
| Anchor Investor | Fund House | Shares | Amount (₹ Cr) | % of Anchor Book |
|---|---|---|---|---|
| Craft Emerging Market Fund Pcc-Arbitrage Strategy Fund | Craft Emerging Market Fund Pcc | 1,340,104 | 12.46 | 33.27% |
| Craft Emerging Market Fund Pcc-Citadel Capital Fund | Craft Emerging Market Fund Pcc | 1,075,319 | 10.00 | 26.69% |
| Minerva Emerging Opportunities Fund Ltd. | Minerva | 537,659 | 5.00 | 13.35% |
| Ekamya Pragati Scheme 1 | Ekamya | 537,659 | 5.00 | 13.35% |
| Craft Emerging Market Fund Pcc-Elite Capital Fund | Craft Emerging Market Fund Pcc | 537,659 | 5.00 | 13.35% |
| Total anchor allocation | 37.46 | |||
Anchor investors bid a day before the issue opens and are locked in after allotment, so a book weighted towards domestic mutual funds is generally read as a stronger signal than one filled by short-horizon funds. Browse every anchor investor scheme or fund house we track.
About the company
Its range covers mild steel black pipes and tubes, galvanized pipes, metal beam crash barriers and galvanized iron tubular poles. These are made in different sizes to Indian Standards and are used in water supply and plumbing, infrastructure and construction, roads and highways, bridges, oil and gas, chemicals, agriculture and rural electrification.
The company has been adding new products to catch infrastructure demand. In FY2025 it started making W-beam and Thrie-beam metal crash barriers, which are the guard rails used along highways, and in FY2026 it added GI tubular poles used for street lighting and electrification work. It works mainly on a business to business basis, selling directly to institutional and industrial buyers including infrastructure contractors, and also through its dealer network. Its manufacturing facility is at Hisar in Haryana.
Interested in this IPO? Check the live subscription status or browse all upcoming mainboard IPOs.
016 6223 6500
The bankers & the filings
Who is running the book, and the documents this page is built from.
Lead Manager Track Record
How the book-running lead managers on this issue have priced their past IPOs, measured on listing day.
Sarthi Capital Advisors Pvt.Ltd.
2 issues handled2 of their issues have listed so far, and 1 opened above the issue price (average -8.1%). That is too small a sample to read as a hit rate.
Listing gain compares the listing-day opening price with the issue price, using the IPOs on IPO Guru that this lead manager has taken to market. A strong record reflects how the banker has priced past issues — it is not a forecast for this one. See every issue they have handled on the lead managers page.
Company contact
Frequently asked
What is the GMP of Jindal Supreme (India)?
The current Grey Market Premium is ₹29, or 31.18% over the issue price.
What is the Jindal Supreme (India) IPO price band?
₹88 to ₹93, on a face value of ₹10.
When is the allotment?
The basis of allotment is 21 September 2026, with listing on 23 September 2026.
How do I check allotment status?
On the IPO Guru allotment page or on the registrar's site — Bigshare Services Private Limited.
Every number here traces back to a filing.
IPO Guru tracks GMP, subscription and allotment for every Mainboard and SME issue. Every number on this page is sourced from the RHP, BSE & NSE.
Not investment advice. Grey market premium is an unofficial, unregulated indicator and is not a forecast.