IPO Guru
Closed Mainboard

Swastika Infra IPO

Swastika Infra IPO — date, price band, lot size & details 2026

Swastika Infra listed on 30 Sep 2026 at ₹200, 8.1% above the ₹185 issue price.

Swastika Infra Limited is an EPC contractor for power distribution infrastructure, covering underground cabling, gas and air insulated substations, rural and urban electrification under government schemes, and street lighting. It also trades power cables and electrical products.

Stock price

Swastika Infra is listed — here is the live share price.

Loading market data…
Abhishek Vohera, Founder of IPO Guru Researched & reviewed by Abhishek Vohera, Founder, IPO Guru Last updated Figures sourced from the RHP, BSE & NSE

Timetable

Key dates from opening to listing. Today is 13 October.

Key dates Listed
  1. Open 23 Sep 2026
  2. Close 25 Sep 2026
  3. Allotment 28 Sep 2026
  4. Refund/credit 29 Sep 2026
  5. Listing 30 Sep 2026

Latest news

Our news coverage of Swastika Infra, newest first.

All IPO news →

Issue summary

The terms of the offer, as filed.

IPO Dates 23 to 25 Sep, 2026
Price Band ₹175 – ₹185
Face Value ₹10
Lot Size 81 Shares
Issue Size ₹160.88 Cr
Sale Type Fresh capital cum OFS
Listing On BSE, NSE
Registrar MUFG Intime India Private Limited
Min Investment ₹ 14,985
Reservation
QIB ≤ 50%
Retail ≥ 35%
NII ≥ 15%

Share of the offer set aside for each investor category, as stated in the offer document.

What will it cost me?

Bidding is in multiples of 81 shares at the ₹185 cut-off. Drag to size your application.

shares
1 lot lots
If it lists at today's grey market premium of ₹7
on
Grey market premium is an unofficial, unregulated indicator. It is not a forecast.
Application Lots Shares Amount
Retail (min) 1 81 ₹14,985
Retail (max) 13 1,053 ₹1,94,805
S-HNI (min) 14 1,134 ₹2,09,790
S-HNI (max) 66 5,346 ₹9,89,010
B-HNI (min) 67 5,427 ₹10,03,995

Strengths & risks

Drawn from the offer document — the case for and against, side by side.

Strengths · 7

  • 01Sales grew strongly over the years shown, from Rs 59.54 crore in FY2022 to Rs 154.32 crore in FY2023 and Rs 211.33 crore in FY2024.
  • 02Profit grew over the same period, from Rs 2.95 crore in FY2022 to Rs 10.25 crore in FY2023 and Rs 13.98 crore in FY2024.
  • 03Return ratios on the data available are good, with RoNW of 32.84% and RoCE of 25.15%.
  • 04Net worth grew from Rs 20.57 crore in FY2022 to Rs 55.52 crore as on 30 September 2024.
  • 05It offers turnkey capability across cabling, substations, electrification and street lighting, so it can bid for complete packages rather than parts of a job.
  • 06Rural and urban electrification work is backed by government schemes, which provides a steady pipeline of tenders.
  • 07Gas insulated substation work is more technical than ordinary cabling and fewer contractors can execute it.

Risks · 8

  • 01The financial data is two years out of date. The most recent figures available are a half year ending 30 September 2024, for an issue opening in September 2026, and there is no FY2025 or FY2026 data at all. This needs to be read from the RHP before relying on any of it.
  • 02The P/E and EPS are not stated, and neither the EBITDA nor the total borrowing rows are present in the available data, so margin and leverage cannot be assessed from here.
  • 03The promoter details and the pre and post issue promoter holding are not stated either, so the extent of dilution is not clear.
  • 04Rs 145 crore of the Rs 160.87 crore issue goes into working capital. EPC work blocks large amounts of cash in unbilled work and retention money.
  • 05The company is young, having been incorporated only in August 2019.
  • 06Most customers are state electricity utilities and government bodies, which pay slowly and award work through price-driven tenders.
  • 07A part of the revenue comes from trading electrical products, which earns less than the project work.
  • 08This is a fresh issue combined with an offer for sale, so a part of the money goes to the selling shareholders and not to the company.

Three years of numbers

All figures in ₹ crore, as reported in the Swastika Infra offer document.

Total income
100.52
154
211
101
31 Mar 202331 Mar 202430 Sep 2024
Profit after tax
5.97
10
14
6
31 Mar 202331 Mar 202430 Sep 2024
Net worth
55.52
36
50
56
31 Mar 202331 Mar 202430 Sep 2024
Metric 30 Sep 2024 31 Mar 2024 31 Mar 2023 31 Mar 2022
Assets 156.06 143.26 97.96 81.69
Total Income 100.52 211.33 154.32 59.54
Profit After Tax 5.97 13.98 10.25 2.95
NET Worth 55.52 49.57 35.59 20.57
Reserves and Surplus 30.77 24.82 10.84 0.57

See how this IPO compares — view listing performance of all mainboard IPOs.

Valuation & key ratios

Ratios are for the latest full financial year reported in the Swastika Infra RHP. EPS and P/E are post-issue — the table below carries the pre-issue comparison.

P/E Ratio
15.24
EPS (₹)
12.14
RoE
35.44%
RoCE
25.15%
RoNW
32.84%
PAT Margin
6.67%
EBITDA Margin
14.07%
Debt / Equity
0.88
NAV (₹)
20.03

Swastika Infra IPO Valuation

How the issue prices the company before and after the fresh shares are created.

Valuation Metric Pre-Issue Post-Issue
EPS (₹) ₹15.70 ₹12.14
P/E Ratio (x) 11.78 15.24
Market Cap at Offer Price (₹ Cr) ₹70.35 ₹631.22

Pre-issue figures use the shareholding reported in the RHP; post-issue figures use the shareholding once the fresh issue has created new shares. The two differ because of that dilution and because post-issue earnings per share are often annualised, so the change can run in either direction. Market capitalisation is calculated at the ₹185 offer price. Compare the post-issue P/E against listed peers before deciding — a premium there is growth you are paying for in advance.

Where the money goes

₹145.00 Cr of the issue is earmarked to named objects.

Funding of incremental working capital requirements of the Company. ₹145.00 Cr
General corporate purposes. Not stated

Swastika Infra IPO Anchor Investors

6 anchor investors across 6 fund houses committed ₹48.26 Cr a day before the issue opened.

Anchor Investor Fund House Shares Amount (₹ Cr) % of Anchor Book
Krone Finstock Pvt.ltd. Krone Finstock 446,458 8.26 17.11%
Shine Star Build-Cap Pvt.ltd. Shine Star 540,594 10.00 20.72%
Minerva Ventures Fund Minerva 540,594 10.00 20.72%
Longthrive Capital Vcc-Trendview Capital Fund Longthrive Capital Vcc 540,594 10.00 20.72%
Swyom India Alpha Fund Swyom 270,271 5.00 10.36%
Asas Global Fund Incorporated Vcc Sub Fund Asas Global 270,271 5.00 10.36%
Total anchor allocation 48.26

Anchor investors bid a day before the issue opens and are locked in after allotment, so a book weighted towards domestic mutual funds is generally read as a stronger signal than one filled by short-horizon funds. Browse every anchor investor scheme or fund house we track.

About the company

Swastika Infra Limited was started in August 2019. It is an engineering, procurement and construction company, usually called an EPC company, working on power distribution infrastructure. It also sells electrical products.

Its EPC work is turnkey, meaning it handles the whole job from buying the material through to erection, installation, testing and commissioning. The work covers four main areas. Underground cabling involves laying and commissioning high and low voltage power cables, which cuts power losses compared with overhead lines. Substation construction covers both gas insulated and air insulated substations, including installing power transformers, circuit breakers and ring main units. Rural and urban electrification projects extend electricity to underserved areas through distribution networks, service connections and feeder lines, generally under government schemes. It also installs street lighting systems.

Alongside the project work it trades in electrical products, buying and selling power cables and other electrical items. The EPC work is the main business and the trading is secondary.

Interested in this IPO? Check the live subscription status or browse all upcoming mainboard IPOs.

Promoters
Babulal Gupta, Vinay Gupta, Ruchira Gupta, Biren Parnami, Manoj Modi and Vatsalya Gupta
Promoter holding
76.51% → 57.41%
Pre-issue → post-issue
Registered office
Plot no.14 &15, First Floor, Gajraj Apartment, Motilalatal Road, Opposite Hotel Neelam, Jaipur, Rajasthan, India, Jaipur, Rajasthan, 302001
+91 9116135709

The bankers & the filings

Who is running the book, and the documents this page is built from.

Book-running lead manager
Srujan Alpha Capital Advisors LLP, PhillipCapital India Pvt.Ltd.
Red Herring Prospectus
SEBI filing
Final offer document — price band, financials and risk factors. This page is built from it.
Open the RHP
Draft RHP
SEBI filing
The draft filed ahead of approval, useful for comparing what changed.
Open the DRHP

Swastika Infra IPO Documents

Read the filings this page is built from.

Company contact

Company
Swastika Infra
Email

Frequently asked

What is the GMP of Swastika Infra?

The current Grey Market Premium is ₹7, or 3.78% over the issue price.

What is the Swastika Infra IPO price band?

₹175 to ₹185, on a face value of ₹10.

When is the allotment?

The basis of allotment is 28 September 2026, with listing on 30 September 2026.

How do I check allotment status?

On the IPO Guru allotment page or on the registrar's site — MUFG Intime India Private Limited.

Swastika Infra IPO

Every number here traces back to a filing.

IPO Guru tracks GMP, subscription and allotment for every Mainboard and SME issue. Every number on this page is sourced from the RHP, BSE & NSE.

Join the WhatsApp channel All mainboard IPOs

Not investment advice. Grey market premium is an unofficial, unregulated indicator and is not a forecast.

GMP
₹7
Subscribed
7.6×
Min bid
₹14,985
Size my application