Power Mech Projects IPO Subscription Status
Power Mech Projects IPO was subscribed 38.12 times when bidding closed on 11 Aug 2015: QIB 27.53x, NII 133.22x, Retail 3.42x.
The Power Mech Projects IPO has been subscribed 38.12x times overall. Retail investors have shown interest with bids for 3.42x the shares available. The Non-Institutional Investor (NII) category has been subscribed 133.22x. Qualified Institutional Buyers (QIBs) have subscribed 27.53x. Data last updated on 12 Nov, 03:10 PM.
The IPO subscription period has ended. Given the strong demand, the allotment process is expected to be highly competitive. The issue opened on 07 Aug, 2015 and closes on 11 Aug, 2015. The shares are expected to list on stock exchanges on 26 Aug, 2015.
Live bidding
Shares bid against shares offered, category by category, as published by the exchanges. Summary splits NII into bHNI (above ₹10 lakh) and sHNI (₹2–10 lakh); switch to Detailed for the exchange's own sub-category rows.
| Category | Bid details | Times |
|---|---|---|
| QIB | - of - - | 27.53x |
| NII | - of - - | 133.22x |
| Retail | - of - - | 3.42x |
| TOTAL | - - | 38.12x |
Power Mech Projects IPO allotment probability
Your odds of an allotment in each category at the current subscription.
Odds = allotment slots ÷ applications, or the subscription multiple where counts aren't available. Retail and HNI allotment is by lottery; QIB is proportionate. Not investment advice.
Subscription insights
What the current book is saying, read off the category numbers above.
Retail Allotment
Subscription is above 1x. While a lottery is guaranteed, your probability of allotment is approximately 29.2% for a single lot.
Institutional Backing
Massive institutional interest with QIBs subscribing 27.53x. This often signals long-term confidence from professional funds.
Day-wise subscription history
End-of-day subscription across the 3-day bidding window. On phones, tap a day for the category split.
| Date | Total | ||
|---|---|---|---|
|
11 Aug 2015
Day 3 |
38.12x | ▼ | |
|
QIB27.53x
BHNI-
SHNI-
Retail3.42x
|
|||
|
10 Aug 2015
Day 2 |
0.45x | ▼ | |
|
QIB-
BHNI-
SHNI-
Retail-
|
|||
|
07 Aug 2015
Day 1 |
0.07x | ▼ | |
|
QIB-
BHNI-
SHNI-
Retail-
|
|||
Power Mech Projects IPO dates
From the bidding window to listing. Today is 17 November.
- Open 07 Aug 2015
- Close 11 Aug 2015
- Allotment 15 Aug 2015
- Refund/credit TBA
- Listing 26 Aug 2015
Anchor investor allocation
Shares allotted to anchor investors the working day before the issue opened.
| # | Anchor Investor | Group Entity | Amt (₹ cr.) | % Allocated | |
|---|---|---|---|---|---|
| 1 | IDFC PREMIER EQUITY FUND | BANDHAN MUTUAL FUND | ₹25.99 Cr | 31.71% | |
| 2 | DSP BLACKROCK INDIA T.I.G.E.R. FUND | DSP MUTUAL FUND | ₹13.99 Cr | 17.07% | |
| 3 | SBI SMALL AND MIDCAP FUND | SBI MUTUAL FUND | ₹11.73 Cr | 14.32% | |
| 4 | MORGAN STANLEY MAURITIUS COMPANY LIMITED | MORGAN STANLEY | ₹8.99 Cr | 10.97% | |
| 5 | TATA AIA LIFE INSURANCE CO LTD A/C WHOLE LIFE MID CAP EQUITY FUND ULIF 009 04/01/07 WLE 110 | TATA AIA LIFE INSURANCE | ₹7.00 Cr | 8.54% | |
| 6 | L AND T MUTUAL FUND TRUSTEE LTD-L AND T BUSINESS CYCLES FUND | L&T MUTUAL FUND | ₹4.00 Cr | 4.88% | |
| 7 | HDFC TRUSTEE COMPANY LIMITED - HDFC CAPITAL BUILDER FUND | HDFC MUTUAL FUND | ₹3.50 Cr | 4.27% | |
| 8 | HDFC SMALL AND MIDCAP FUND | HDFC MUTUAL FUND | ₹3.50 Cr | 4.27% | |
| 9 | SBI MAGNUM MULTICAP FUND | SBI MUTUAL FUND | ₹2.26 Cr | 2.75% | |
| 10 | L AND T MUTUAL FUND TRUSTEE LIMITED-L AND T INDIA VALUE FUND | L&T MUTUAL FUND | ₹1.00 Cr | 1.22% | |
| TOTAL | ₹81.96 Cr | 100.00% |
What does this subscription data mean?
IPO subscription data tells you how much demand exists for the shares being offered, broken down by investor category. Understanding each category helps you gauge the real sentiment behind the numbers:
- 01 QIB (Qualified Institutional Buyers) — includes mutual funds, FIIs, insurance companies, and banks. QIBs do deep due diligence before bidding. A QIB subscription above 10x is a strong institutional endorsement. Watch QIB numbers closely on the final day — they often hold back and flood in after 3 PM.
- 02 NII / HNI (Non-Institutional Investors) — high-net-worth individuals bidding above ₹2 lakh. NII allotment is proportionate (not lottery), so higher NII subscription means smaller per-lot allotment. Big HNI (B-HNI) bids above ₹10 lakh; Small HNI (S-HNI) bids ₹2–10 lakh.
- 03 Retail — individual investors bidding up to ₹2 lakh. When retail is below 1x, everyone who applied gets full allotment. When oversubscribed, SEBI mandates a computerised lottery — only 1 lot per successful applicant regardless of how many lots you apply for.
- 04 Overall Subscription — a blended multiple across all categories. A total subscription above 10x is considered strong; above 50x is exceptional and usually predicts strong listing gains.
Data sourced from BSE/NSE. Subscription numbers are updated during bidding hours (10 AM – 5 PM IST) on active subscription days.
Frequently asked
What is the current subscription status of Power Mech Projects IPO?
As of IPO close date (11 Aug, 2015), the Power Mech Projects IPO is subscribed 38.12x times. Retail category is 3.42x, and NII is 133.22x subscribed.
When is the allotment date for Power Mech Projects IPO?
The allotment for Power Mech Projects IPO is expected to be finalized on 15 August, 2015.
When will Power Mech Projects IPO list on the stock market?
Power Mech Projects is scheduled to list on BSE and NSE on 26 August, 2015.
What are the chances of getting allotment in Power Mech Projects IPO?
The retail category is oversubscribed at 3.42x, meaning allotment is by lottery. Statistically, approximately 1 in 4 applicants will receive allotment. Applying with multiple family member accounts (each at minimum lot size) improves your cumulative odds.
What does QIB subscription of 27.53x mean for Power Mech Projects IPO?
Strong — QIBs (mutual funds, FIIs, insurance companies) have subscribed 27.53x, indicating high institutional conviction. Heavy QIB demand is historically one of the strongest predictors of a positive listing.
How to check Power Mech Projects IPO allotment status?
After the allotment date (15 Aug, 2015), you can check your Power Mech Projects IPO allotment status on IPO Guru's allotment checker, on the BSE/NSE website using your PAN or application number, or through your broker's app.
Explore Power Mech Projects IPO further
Track every stage of this IPO, from subscription to listing.
It has listed — go back to the fundamentals.
Live grey market premium, Kostak and Subject to Sauda, with the day-wise trend.
What brokers and analysts are saying about this issue, in one place.
Check with your PAN whether shares were credited to your demat account.
Subscription moves by the hour. Get it on your phone.
Live GMP alerts, subscription updates and allotment status for every Mainboard and SME issue — fast, free and secure.
Not investment advice. Subscription figures are as published by BSE/NSE and change until bidding closes.