Central Mine Planning & Design Institute IPO
Central Mine Planning & Design Institute IPO — date, price band, lot size & details 2026
Central Mine Planning & Design Institute listed on 30 Mar 2026 at ₹160, 7% below the ₹172 issue price.
The IPO of Central Mine Planning & Design Institute Limited (CMPDI), a subsidiary of Coal India, is scheduled to open on 20 March 2026 and close on 24 March 2026. The company was founded in 1975 and is headquartered in Ranchi, Jharkhand. CMPDI operates as a mining consultancy firm providing services like mine planning, mineral exploration, environmental management, and engineering support for the coal and mining sector. The company has a pan-India presence with regional institutes and field units supporting India’s mining industry.
Stock price
Central Mine Planning & Design Institute is listed — here is the live share price.
Timetable
Key dates from opening to listing. Today is 3 October.
- Open 20 Mar 2026
- Close 24 Mar 2026
- Allotment 25 Mar 2026
- Refund/credit 27 Mar 2026
- Listing 30 Mar 2026
Issue summary
The terms of the offer, as filed.
| IPO Dates | 20 to 24 Mar, 2026 |
|---|---|
| Price Band | ₹163 – ₹172 |
| Face Value | ₹2 |
| Lot Size | 80 Shares |
| Issue Size | ₹1842 Cr |
| Sale Type | book build issue |
| Listing On | BSE, NSE |
| Employee Discount | Rs 8.00 per share |
| Registrar | KFin Technologies Limited |
| Min Investment | ₹ 13,760 |
Share of the offer set aside for each investor category, as stated in the offer document.
What will it cost me?
Bidding is in multiples of 80 shares at the ₹172 cut-off. Drag to size your application.
| Application | Lots | Shares | Amount |
|---|---|---|---|
| Retail (min) | 1 | 80 | ₹13,760 |
| Retail (max) | 14 | 1,120 | ₹1,92,640 |
| S-HNI (min) | 15 | 1,200 | ₹2,06,400 |
| S-HNI (max) | 72 | 5,760 | ₹9,90,720 |
| B-HNI (min) | 73 | 5,840 | ₹10,04,480 |
Three years of numbers
All figures in ₹ crore, as reported in the Central Mine Planning & Design Institute offer document.
| Metric | 31 Dec 2025 | 31 Mar 2025 | 31 Mar 2024 |
|---|---|---|---|
| Revenue | 1,543.93 | 2,177.53 | 1,770.18 |
| EBITDA | 593.85 | 915.71 | 764.44 |
| Net Profit | 425.36 | 666.91 | 503.23 |
| Reserves and Surplus | 2,010.98 | 1,899.05 | 1,448.81 |
| Assets | 2,911.12 | 2,682.80 | 2,171.37 |
See how this IPO compares — view listing performance of all mainboard IPOs.
Valuation & key ratios
Ratios are for the latest full financial year reported in the Central Mine Planning & Design Institute RHP. EPS and P/E are post-issue — the table below carries the pre-issue comparison.
Central Mine Planning & Design Institute IPO Valuation
How the issue prices the company before and after the fresh shares are created.
| Valuation Metric | Post-Issue |
|---|---|
| EPS (₹) | ₹7.94 |
| P/E Ratio (x) | 21.65 |
| Market Cap at Offer Price (₹ Cr) | ₹9,214.35 |
Pre-issue figures use the shareholding reported in the RHP; post-issue figures use the shareholding once the fresh issue has created new shares. The two differ because of that dilution and because post-issue earnings per share are often annualised, so the change can run in either direction. Market capitalisation is calculated at the ₹172 offer price. Compare the post-issue P/E against listed peers before deciding — a premium there is growth you are paying for in advance.
Where the money goes
How the company intends to use the proceeds of the issue.
Central Mine Planning & Design Institute IPO Anchor Investors
22 anchor investors across 17 fund houses committed ₹469.73 Cr a day before the issue opened.
Anchor investors bid a day before the issue opens and are locked in after allotment, so a book weighted towards domestic mutual funds is generally read as a stronger signal than one filled by short-horizon funds. Browse every anchor investor scheme or fund house we track.
About the company
The company provides a wide range of services including geological exploration, mine planning, environmental management, and engineering consultancy. Its business model is primarily consultancy-driven, where it undertakes projects for coal companies, government organisations, and other stakeholders on a contract basis. CMPDI earns revenue through project fees and long-term consultancy assignments, ensuring a steady income stream. It also focuses on adopting modern technologies such as remote sensing, GIS mapping, and digital mine planning tools to enhance efficiency and accuracy. With its strong technical capabilities and long-standing association with the coal industry, CMPDI continues to play a crucial role in India’s energy and mining ecosystem while maintaining sustainable and responsible mining practices.
Interested in this IPO? Check the live subscription status or browse all upcoming mainboard IPOs.
0651 - 2230169
The bankers & the filings
Who is running the book, and the documents this page is built from.
Central Mine Planning & Design Institute IPO Documents
Read the filings this page is built from.
Lead Manager Track Record
How the book-running lead managers on this issue have priced their past IPOs, measured on listing day.
SBI Capital Markets Ltd.
14 issues handledBest listing: Indo-MIM (+44.3%). Weakest: Fujiyama Power Systems (-3.5%).
IDBI Capital Markets & Securities Ltd.
4 issues handledBest listing: Bharat Coking Coal (+95.7%). Weakest: Vidya Wires (0.0%).
Listing gain compares the listing-day opening price with the issue price, using the IPOs on IPO Guru that this lead manager has taken to market. A strong record reflects how the banker has priced past issues — it is not a forecast for this one. See every issue they have handled on the lead managers page.
Company contact
Frequently asked
What is the GMP of Central Mine Planning & Design Institute?
The current Grey Market Premium is ₹5, or 3% over the issue price.
What is the Central Mine Planning & Design Institute IPO price band?
₹163 to ₹172, on a face value of ₹2.
When is the allotment?
The basis of allotment is 25 March 2026, with listing on 30 March 2026.
How do I check allotment status?
On the IPO Guru allotment page or on the registrar's site — KFin Technologies Limited.
Every number here traces back to a filing.
IPO Guru tracks GMP, subscription and allotment for every Mainboard and SME issue. Every number on this page is sourced from the RHP, BSE & NSE.
Not investment advice. Grey market premium is an unofficial, unregulated indicator and is not a forecast.