IPO Guru
Bajaj
Closed Mainboard

Vikran Engineering IPO

Vikran Engineering IPO — date, price band, lot size & details 2025

Vikran Engineering listed on 3 Sep 2025 at ₹99, 2.1% above the ₹97 issue price.

Vikran Engineering is an EPC company working in power transmission and distribution, water infrastructure, railways and solar. It had completed 45 projects across 14 states by 30 June 2025.

Stock price

Vikran Engineering is listed — here is the live share price.

Loading market data…
Abhishek Vohera, Founder of IPO Guru Researched & reviewed by Abhishek Vohera, Founder, IPO Guru Last updated Figures sourced from the RHP, BSE & NSE

Timetable

Key dates from opening to listing. Today is 10 November.

Key dates Listed
  1. Open 26 Aug 2025
  2. Close 29 Aug 2025
  3. Allotment 01 Sep 2025
  4. Refund/credit 02 Sep 2025
  5. Listing 03 Sep 2025

Issue summary

The terms of the offer, as filed.

IPO Dates 26 to 29 Aug, 2025
Price Band ₹92 – ₹97
Face Value ₹1
Lot Size 148 Shares
Issue Size ₹772 Cr
Sale Type Fresh capital cum OFS
Listing On BSE, NSE
Registrar Bigshare Services Private Limited
Min Investment ₹ 14,356
Reservation
QIB 50%
NII 15%
Retail 35%

Share of the offer set aside for each investor category, as stated in the offer document.

What will it cost me?

Bidding is in multiples of 148 shares at the ₹97 cut-off. Drag to size your application.

shares
1 lot lots
If it lists at today's grey market premium of ₹5
on
Grey market premium is an unofficial, unregulated indicator. It is not a forecast.
Application Lots Shares Amount
Retail (min) 1 148 ₹14,356
Retail (max) 13 1,924 ₹1,86,628
S-HNI (min) 14 2,072 ₹2,00,984
S-HNI (max) 69 10,212 ₹9,90,564
B-HNI (min) 70 10,360 ₹10,04,920

Strengths & risks

Drawn from the offer document — the case for and against, side by side.

Strengths · 5

  • 01Total income rose from Rs 529.18 crore in FY2023 to Rs 922.36 crore in FY2025.
  • 02Profit after tax rose from Rs 42.84 crore in FY2023 to Rs 77.82 crore in FY2025.
  • 03The EBITDA margin was 17.50% and return on capital employed was 23.34%.
  • 04Rs 721.00 crore of the Rs 772 crore issue was fresh capital.
  • 05The company had completed 45 projects across 14 states by 30 June 2025.

Risks · 6

  • 01Rs 541.00 crore of the proceeds was for working capital, which shows how much cash project work ties up.
  • 02Profit after tax barely rose from Rs 74.83 crore in FY2024 to Rs 77.82 crore in FY2025.
  • 03The P/E was 32.15 at the upper band of Rs 97, based on post-issue EPS of Rs 3.02.
  • 04Total borrowing rose from Rs 183.39 crore on 31 March 2024 to Rs 272.94 crore on 31 March 2025.
  • 05Total assets rose from Rs 959.79 crore to Rs 1,354.68 crore in the year to 31 March 2025, and EPC receivables can take long to collect.
  • 06Promoters held 81.78% before the issue and held 56.17% after it.

Three years of numbers

All figures in ₹ crore, as reported in the Vikran Engineering offer document.

Total income
922.36
529
791
922
31 Mar 202331 Mar 202431 Mar 2025
Profit after tax
77.82
43
75
78
31 Mar 202331 Mar 202431 Mar 2025
EBITDA
160.24
80
133
160
31 Mar 202331 Mar 202431 Mar 2025
Borrowing vs net worth
272.94 / 467.87
31 Mar 202331 Mar 202431 Mar 2025
Borrowing Net worth
Metric 31 Mar 2025 31 Mar 2024 31 Mar 2023
Assets 1,354.68 959.79 712.47
Total Income 922.36 791.44 529.18
Profit After Tax 77.82 74.83 42.84
EBITDA 160.24 133.30 79.71
NET Worth 467.87 291.28 131.14
Reserves and Surplus 449.52 290.95 130.85
Total Borrowing 272.94 183.39 154.92

See how this IPO compares — view listing performance of all mainboard IPOs.

Valuation & key ratios

Ratios are for the latest full financial year reported in the Vikran Engineering RHP. EPS and P/E are post-issue — the table below carries the pre-issue comparison.

P/E Ratio
32.15
EPS (₹)
3.02
RoE
16.63%
RoCE
23.34%
RoNW
16.63%
PAT Margin
8.44%
EBITDA Margin
17.50%
Debt / Equity
0.58
NAV (₹)
25.49

Vikran Engineering IPO Valuation

How the issue prices the company before and after the fresh shares are created.

Valuation Metric Pre-Issue Post-Issue
EPS (₹) ₹4.24 ₹3.02
P/E Ratio (x) 22.88 32.15
Market Cap at Offer Price (₹ Cr) ₹1,780.32 ₹2,499.52

Pre-issue figures use the shareholding reported in the RHP; post-issue figures use the shareholding once the fresh issue has created new shares. The two differ because of that dilution and because post-issue earnings per share are often annualised, so the change can run in either direction. Market capitalisation is calculated at the ₹97 offer price. Compare the post-issue P/E against listed peers before deciding — a premium there is growth you are paying for in advance.

Where the money goes

₹724.54 Cr of the issue is earmarked to named objects.

Funding working capital requirements of the Company ₹541.00 Cr
General Corporate Purposes ₹129.97 Cr
Issue Expenses ₹53.57 Cr

Vikran Engineering IPO Anchor Investors

21 anchor investors across 13 fund houses committed ₹231.60 Cr a day before the issue opened.

Anchor Investor Fund House Shares Amount (₹ Cr) % of Anchor Book
Bank Of India Small Cap Fund Bank Of India Mutual Fund 2,386,500 23.15 10.00%
Bank Of India Manufacturing & Infrastructure Fund Bank Of India Mutual Fund 606,800 5.89 2.54%
Bank Of India Mid Cap Tax Fund Series 1 Bank Of India Mutual Fund 65,564 0.64 0.27%
Bank Of India Mid Cap Tax Fund Series 2 Bank Of India Mutual Fund 34,040 0.33 0.14%
ITI Multi Cap Fund ITI Mutual Fund 1,030,968 10.00 4.32%
ITI Mid Cap Fund ITI Mutual Fund 1,030,968 10.00 4.32%
ITI Flexi Cap Fund ITI Mutual Fund 1,030,968 10.00 4.32%
Nippon India Equity Opportunities AIF - Scheme 8 Nippon India Mutual Fund 2,061,936 20.00 8.64%
Lc Pharos Multi Strategy Fund Vcc-Lc Pharos Multi Strategy Fund Sf1 Lc Pharos 2,061,936 20.00 8.64%
Negen Undiscovered Value Fund Negen 2,061,936 20.00 8.64%
SBI General Insurance Co.ltd. SBI General Insurance 2,061,788 20.00 8.64%
Samco Multi Cap Fund Samco Mutual Fund 515,484 5.00 2.16%
Samco Multi Asset Allocation Fund Samco Mutual Fund 515,484 5.00 2.16%
Samco Active Momentum Fund Samco Mutual Fund 515,484 5.00 2.16%
Bengal Finance & Investment Pvt.ltd. Bengal Finance & Investment 1,546,452 15.00 6.48%
360 One Equity Opportunity Fund 360 One 515,484 5.00 2.16%
360 One Equity Opportunity Fund - Series 4 360 One 515,484 5.00 2.16%
Taurus Flexi Cap Fund Taurus Mutual Fund 1,030,968 10.00 4.32%
Vpk Global Ventures Fund - Scheme 1 Vpk Global Ventures 1,030,119 9.99 4.31%
Imap India Capital Investment Trust-Catalyst New India Fund Imap India 515,484 5.00 2.16%
Societe Generale-Odi Societe General 2,742,440 26.60 11.49%
Total anchor allocation 231.60

Anchor investors bid a day before the issue opens and are locked in after allotment, so a book weighted towards domestic mutual funds is generally read as a stronger signal than one filled by short-horizon funds. Browse every anchor investor scheme or fund house we track.

About the company

Vikran Engineering Limited was incorporated in 2008. It carries out engineering, procurement and construction work. Its power work includes extra-high voltage substations up to 400kV and power distribution.

Its water projects include underground water distribution, surface water extraction, overhead tanks and distribution networks. It also works on railway infrastructure and solar EPC projects.

By 30 June 2025 the company had completed 45 projects across 14 states.

The IPO was Rs 772 crore, with Rs 721.00 crore of fresh issue and Rs 51.00 crore of offer for sale. Rs 541.00 crore was planned for working capital.

Interested in this IPO? Check the live subscription status or browse all upcoming mainboard IPOs.

Promoters
Rakesh Ashok Markhedkar, Avinash Ashok Markhedkar and Nakul Markhedkar
Promoter holding
81.78% → 56.17%
Pre-issue → post-issue
Registrar

The bankers & the filings

Who is running the book, and the documents this page is built from.

Book-running lead manager
Pantomath Capital Advisors Pvt Ltd View track record →
Book-running lead manager
Systematix Corporate Services Limited View track record →
Red Herring Prospectus
SEBI filing
Final offer document — price band, financials and risk factors. This page is built from it.
Open the RHP
Anchor allocation
Exchange filing
The anchor book as filed with the exchange a day before the issue opened.
Open the filing

Vikran Engineering IPO Documents

Read the filings this page is built from.

Lead Manager Track Record

How the book-running lead managers on this issue have priced their past IPOs, measured on listing day.

Listed in Profit 66.7% 8 of 12 listed
Avg Listing Gain +10.2% across 12 issues
Listed Below Issue 4 of 12 listed

Best listing: Highway Infrastructure (+64.3%). Weakest: Glottis (-34.9%).

Listed in Profit 50% 4 of 8 listed
Avg Listing Gain +17.3% across 8 issues
Listed Below Issue 4 of 8 listed

Best listing: ESDS Software Solution (+76.5%). Weakest: Acevector (-11.5%).

Listing gain compares the listing-day opening price with the issue price, using the IPOs on IPO Guru that this lead manager has taken to market. A strong record reflects how the banker has priced past issues — it is not a forecast for this one. See every issue they have handled on the lead managers page.

Company contact

Company
Vikran Engineering
Email

Frequently asked

What is the GMP of Vikran Engineering?

The current Grey Market Premium is ₹5, or 5% over the issue price.

What is the Vikran Engineering IPO price band?

₹92 to ₹97, on a face value of ₹1.

When is the allotment?

The basis of allotment is 1 September 2025, with listing on 3 September 2025.

How do I check allotment status?

On the IPO Guru allotment page or on the registrar's site — Bigshare Services Private Limited.

Vikran Engineering IPO

Every number here traces back to a filing.

IPO Guru tracks GMP, subscription and allotment for every Mainboard and SME issue. Every number on this page is sourced from the RHP, BSE & NSE.

Join the WhatsApp channel All mainboard IPOs

Not investment advice. Grey market premium is an unofficial, unregulated indicator and is not a forecast.

GMP
₹5
Subscribed
24.87×
Min bid
₹14,356
Size my application
Advertisement