IPO Guru
Bajaj
Closed Mainboard

M&B Engineering IPO

M&B Engineering IPO — date, price band, lot size & details 2025

M&B Engineering listed on 6 Aug 2025 at ₹385, flat to the ₹385 issue price.

M&B Engineering provides pre-engineered buildings and self-supported steel roofing solutions. Its two plants at Sanand and Cheyyar have combined capacity of 103,800 MTPA.

Stock price

M&B Engineering is listed — here is the live share price.

Loading market data…
Abhishek Vohera, Founder of IPO Guru Researched & reviewed by Abhishek Vohera, Founder, IPO Guru Last updated Figures sourced from the RHP, BSE & NSE

Timetable

Key dates from opening to listing. Today is 10 November.

Key dates Listed
  1. Open 30 Jul 2025
  2. Close 01 Aug 2025
  3. Allotment 04 Aug 2025
  4. Refund/credit 05 Aug 2025
  5. Listing 06 Aug 2025

Issue summary

The terms of the offer, as filed.

IPO Dates 30 Jul to 1 Aug, 2025
Price Band ₹366 – ₹385
Face Value ₹10
Lot Size 38 Shares
Issue Size ₹650 Cr
Sale Type Fresh capital cum OFS
Listing On BSE, NSE
Employee Discount Rs 36.00 per share
Registrar MUFG Intime India Private Limited
Min Investment ₹ 14,630
Reservation
QIB 75%
NII 15%
Retail 10%
Employee 0.34%

Share of the offer set aside for each investor category, as stated in the offer document.

What will it cost me?

Bidding is in multiples of 38 shares at the ₹385 cut-off. Drag to size your application.

shares
1 lot lots
If it lists at today's grey market premium of ₹47
on
Grey market premium is an unofficial, unregulated indicator. It is not a forecast.
Application Lots Shares Amount
Retail (min) 1 38 ₹14,630
Retail (max) 13 494 ₹1,90,190
S-HNI (min) 14 532 ₹2,04,820
S-HNI (max) 68 2,584 ₹9,94,840
B-HNI (min) 69 2,622 ₹10,09,470

Strengths & risks

Drawn from the offer document — the case for and against, side by side.

Strengths · 5

  • 01Profit after tax rose from Rs 32.89 crore in FY2023 to Rs 77.05 crore in FY2025.
  • 02Total income rose from Rs 808.26 crore in FY2024 to Rs 996.89 crore in FY2025.
  • 03Return on equity was 25.13% and return on capital employed was 24.80%.
  • 04Combined pre-engineered building capacity is 103,800 MTPA across 2 plants.
  • 05Rs 130.58 crore of the fresh issue was for buying equipment.

Risks · 7

  • 01Rs 374.88 crore of the Rs 650 crore issue was offer for sale and did not reach the company.
  • 02The P/E was 28.55 at the upper band of Rs 385, based on post-issue EPS of Rs 13.48.
  • 03Total income fell from Rs 889.00 crore in FY2023 to Rs 808.26 crore in FY2024, so orders can be uneven.
  • 04The PAT margin was 7.73% and the EBITDA margin was 12.78%.
  • 05The Cheyyar plant started only in 2024, so its contribution has a short record.
  • 06Steel prices affect costs, and total borrowing stood at Rs 186.13 crore on 31 March 2025.
  • 07Promoter holding fell from 100% before the issue to 70.45% after it.

Three years of numbers

All figures in ₹ crore, as reported in the M&B Engineering offer document.

Total income
996.89
889
808
997
31 Mar 202331 Mar 202431 Mar 2025
Profit after tax
77.05
33
46
77
31 Mar 202331 Mar 202431 Mar 2025
EBITDA
126.38
66
80
126
31 Mar 202331 Mar 202431 Mar 2025
Borrowing vs net worth
186.13 / 306.53
31 Mar 202331 Mar 202431 Mar 2025
Borrowing Net worth
Metric 31 Mar 2025 31 Mar 2024 31 Mar 2023
Assets 849.21 633.11 558.79
Total Income 996.89 808.26 889.00
Profit After Tax 77.05 45.63 32.89
EBITDA 126.38 79.62 66.43
NET Worth 306.53 233.03 180.51
Reserves and Surplus 256.53 183.03 160.51
Total Borrowing 186.13 204.84 148.75

See how this IPO compares — view listing performance of all mainboard IPOs.

Valuation & key ratios

Ratios are for the latest full financial year reported in the M&B Engineering RHP. EPS and P/E are post-issue — the table below carries the pre-issue comparison.

P/E Ratio
28.55
EPS (₹)
13.48
RoE
25.13%
RoCE
24.80%
RoNW
25.14%
PAT Margin
7.73%
EBITDA Margin
12.78%
Debt / Equity
0.33
NAV (₹)
61.31

M&B Engineering IPO Valuation

How the issue prices the company before and after the fresh shares are created.

Valuation Metric Pre-Issue Post-Issue
EPS (₹) ₹15.41 ₹13.48
P/E Ratio (x) 24.98 28.55
Market Cap at Offer Price (₹ Cr) ₹1,925.00 ₹2,200.61

Pre-issue figures use the shareholding reported in the RHP; post-issue figures use the shareholding once the fresh issue has created new shares. The two differ because of that dilution and because post-issue earnings per share are often annualised, so the change can run in either direction. Market capitalisation is calculated at the ₹385 offer price. Compare the post-issue P/E against listed peers before deciding — a premium there is growth you are paying for in advance.

Where the money goes

₹312.05 Cr of the issue is earmarked to named objects.

Funding the capital expenditure requirements for the purchase of equipment and machinery, building works, solar rooftop grid and transport vehicles at the Manufacturing Facilities ₹130.58 Cr
Investment in IT software upgradation by the Company ₹5.20 Cr
Re-payment or pre-payment of term loans, in full or in part, of certain borrowings availed by the Company ₹58.75 Cr
General Corporate Purposes ₹80.47 Cr
Issue Expenses ₹37.05 Cr

M&B Engineering IPO Anchor Investors

24 anchor investors across 17 fund houses committed ₹291.60 Cr a day before the issue opened.

Anchor Investor Fund House Shares Amount (₹ Cr) % of Anchor Book
HDFC Manufacturing Fund HDFC Mutual Fund 811,680 31.25 10.72%
HDFC Business Cycle Fund HDFC Mutual Fund 162,336 6.25 2.14%
Kotak Infrastructure & Economic Reform Fund Kotak Mahindra Mutual Fund 487,008 18.75 6.43%
Kotak Manufacture In India Fund Kotak Mahindra Mutual Fund 487,008 18.75 6.43%
Whiteoak Capital Special Opportunities Fund Whiteoak Capital Mutual Fund 389,614 15.00 5.14%
Whiteoak Capital Flexi Cap Fund Whiteoak Capital Mutual Fund 222,604 8.57 2.94%
Whiteoak Capital Multi Cap Fund Whiteoak Capital Mutual Fund 85,766 3.30 1.13%
Whiteoak Capital ELSS Tax Saver Fund Whiteoak Capital Mutual Fund 16,302 0.63 0.22%
Ashoka India Equity Investment Trust Plc Ashoka 259,730 10.00 3.43%
ABU Dhabi Investment Authority-Stable ABU Dhabi Investment 909,074 35.00 12.00%
Aditya Birla Sun Life Small Cap Fund Aditya Birla Sun Life Mutual Fund 779,190 30.00 10.29%
Bandhan Large & Mid Cap Fund Bandhan Mutual Fund 324,672 12.50 4.29%
Bandhan Small Cap Fund Bandhan Mutual Fund 324,672 12.50 4.29%
Pinebridge Global Funds-Pinebridge India Equity Fund Pinebridge 324,672 12.50 4.29%
Abakkus Growth Fund-2 Abakkus 324,672 12.50 4.29%
Ikigai Emerging Equity Fund Ikigai 324,672 12.50 4.29%
SBI General Insurance Co.ltd. SBI General Insurance 259,768 10.00 3.43%
JM Small Cap Fund JM Financial Mutual Fund 129,884 5.00 1.71%
JM Value Fund JM Financial Mutual Fund 129,884 5.00 1.71%
Nuvama Crossover Opportunities Fund-Series Iii A Nuvama 248,064 9.55 3.28%
Carnelian Structural Shift Fund Carnelian 183,112 7.05 2.42%
ITI Mid Cap Fund ITI Mutual Fund 129,874 5.00 1.71%
Integrated Core Strategies (Asia) Pte.ltd. Integrated Core 129,884 5.00 1.71%
Societe Generale-Odi Societe General 129,884 5.00 1.71%
Total anchor allocation 291.60

Anchor investors bid a day before the issue opens and are locked in after allotment, so a book weighted towards domestic mutual funds is generally read as a stronger signal than one filled by short-horizon funds. Browse every anchor investor scheme or fund house we track.

About the company

M&B Engineering Limited was incorporated in 1981. It designs, engineers, makes and tests pre-engineered buildings, structural steel and self-supported steel roofing.

Customers come from general engineering, manufacturing, food and beverages, warehousing, logistics, power, textiles and railways.

The company has two plants, at Sanand in Gujarat and Cheyyar in Tamil Nadu. Sanand started in 2008 and Cheyyar in 2024. Combined pre-engineered building capacity is 103,800 MTPA.

The IPO was Rs 650 crore, with Rs 275.12 crore of fresh issue and Rs 374.88 crore of offer for sale. Rs 130.58 crore was planned for equipment and Rs 58.75 crore for repaying term loans.

Interested in this IPO? Check the live subscription status or browse all upcoming mainboard IPOs.

Promoters
Girishbhai Manibhai Patel, Chirag Hasmukhbhai Patel, Malav Girishbhai Patel, Birva Chirag Patel, Vipinbhai Kantilal Patel, Aditya Vipinbhai Patel, Chirag H Patel Family Trust, Vipin K Patel Family Trust, MGM5 Family Trust, MGM11 Family Trust and Aditya V Patel Family Trust
Promoter holding
100% → 70.45%
Pre-issue → post-issue

The bankers & the filings

Who is running the book, and the documents this page is built from.

Book-running lead manager
Equirus Capital Pvt.Ltd. View track record →
Book-running lead manager
Dam Capital Advisors Ltd View track record →
Red Herring Prospectus
SEBI filing
Final offer document — price band, financials and risk factors. This page is built from it.
Open the RHP
Anchor allocation
Exchange filing
The anchor book as filed with the exchange a day before the issue opened.
Open the filing

M&B Engineering IPO Documents

Read the filings this page is built from.

Lead Manager Track Record

How the book-running lead managers on this issue have priced their past IPOs, measured on listing day.

Equirus Capital Pvt.Ltd.

8 issues handled
Listed in Profit 87.5% 7 of 8 listed
Avg Listing Gain +13% across 8 issues
Listed Below Issue 1 of 8 listed

Best listing: CMR Green Technologies (+39.6%). Weakest: Omnitech Engineering (-9.7%).

Dam Capital Advisors Ltd

16 issues handled
Listed in Profit 66.7% 10 of 15 listed
Avg Listing Gain +10.1% across 15 issues
Listed Below Issue 5 of 15 listed

Best listing: ESDS Software Solution (+76.5%). Weakest: Prasol Chemicals (-9.8%).

Listing gain compares the listing-day opening price with the issue price, using the IPOs on IPO Guru that this lead manager has taken to market. A strong record reflects how the banker has priced past issues — it is not a forecast for this one. See every issue they have handled on the lead managers page.

Company contact

Company
M&B Engineering
Email

Frequently asked

What is the GMP of M&B Engineering?

The current Grey Market Premium is ₹47, or 12% over the issue price.

What is the M&B Engineering IPO price band?

₹366 to ₹385, on a face value of ₹10.

When is the allotment?

The basis of allotment is 4 August 2025, with listing on 6 August 2025.

How do I check allotment status?

On the IPO Guru allotment page or on the registrar's site — MUFG Intime India Private Limited.

M&B Engineering IPO

Every number here traces back to a filing.

IPO Guru tracks GMP, subscription and allotment for every Mainboard and SME issue. Every number on this page is sourced from the RHP, BSE & NSE.

Join the WhatsApp channel All mainboard IPOs

Not investment advice. Grey market premium is an unofficial, unregulated indicator and is not a forecast.

GMP
₹47
Subscribed
38.1×
Min bid
₹14,630
Size my application
Advertisement